There is a proposed works programme for the A30 London Road/Broomhall Lane scheme.
- Works Date: 18th March (weather dependant)
- Restricted working hours of 9.30am – 3.30pm
- 3-way temporary traffic signals to be in use for safety and operational reasons
- Signals to be manually controlled in order to avoid issues with proximity of level crossing and to manage traffic conditions as effectively as possible