There is a proposed works programme for the A30 London Road/Broomhall Lane scheme.
Works Date: 18th March (weather dependant)
Restricted working hours of 9.30am – 3.30pm
3-way temporary traffic signals to be in use for safety and operational reasons
Signals to be manually controlled in order to avoid issues with proximity of level crossing and to manage traffic conditions as effectively as possible